Decide the cable or hose size and the total length to be recovered on the reel.
All the reels should be installed with at least one safety turn left on the drum when the required
length of the cable/hose is paid out. This is to reduce damage to the flexible at the point of clamping
or termination by spreading the load over one complete turn. When calculating the length of cable or hose
to be ordered, allowance should be made for the safety turn, tails needed for terminations at each end if
the application calls for a length of cable/hose to be permanently paid out, this must also be included.
The following allowances for safety turn and tails are recommended for each reel which will give
a minimum of 500 mm each end for terminations.
S18 series 2m.
S30 series 2m.
S40 series 3m.
S75 series 4m.
Vertical Payout Length in Meters
| CRD Type |
Cable
OD/weight in Kg per meter |
| 14 mm |
18 mm |
24 mm |
26 mm |
30 mm |
36 mm |
40 mm |
45 mm |
| 0.300 |
0.535 |
0.922 |
1.225 |
1.720 |
2.261 |
3.036 |
3.939 |
| SC-30/1V |
8 |
8 |
- |
- |
- |
- |
- |
- |
| SC-30/2VP |
25 |
15 |
- |
- |
- |
- |
- |
- |
| SC-40/1P |
- |
8 |
8 |
8 |
- |
- |
- |
- |
| SC-40/2P |
- |
- |
22 |
16 |
12 |
- |
- |
- |
| SC-75/1BP |
- |
25 |
- |
- |
- |
- |
- |
- |
| SC-75/2BP |
- |
- |
24 |
23 |
16 |
12 |
9 |
- |
| SC-75/3BP |
- |
- |
- |
25 |
25 |
16 |
15 |
12 |
Reeling Capacity for Horizontal
Payout in Meters
| CRD
Type |
Cable
OD/weight in Kg per meter |
| 10.9mm |
12.8mm |
20.3mm |
26.1mm |
29.1mm |
34.4mm |
39.7mm |
| 0.175 |
0.250 |
0.668 |
1.128 |
1.503 |
2.178 |
2.843 |
| SC-18/1A |
10 |
- |
- |
- |
- |
- |
- |
| SC-30/1V |
- |
18 |
10 |
- |
- |
- |
- |
| SC-30/2X-S |
- |
- |
16 |
- |
- |
- |
- |
| SC-40/1R |
28 |
- |
- |
- |
- |
- |
- |
| SC-40/2P-P |
- |
- |
20 |
18 |
14 |
- |
- |
| SC-75/1BP |
- |
40 |
- |
- |
- |
- |
- |
| SC-75/2BP |
- |
- |
44 |
26 |
20 |
12 |
- |
| SC-75/3BP |
- |
- |
50 |
38 |
30 |
20 |
14 |